A&A Works for Wyler Centre I, Kwai Chung, Hong Kong
Wyler Centre is a 12-storey industrial building with total floor area of 36,000 m2. The A&A works are mainly to modify existing building layout and upgrade the M&E installations in order to enable and facilitate the potential tenants of the building. The major M&E installation includes modification of power distribution system, addition of genset for tenant's use, enabling provisions for future installation of central air conditioning systems.
 E&M Consultancy Services for Citybus / NWFB Bus Depot Modification Works, H.K.
The modification works need detail analysis on the current power system and its usage. Checking the power consumption, usage pattern and maximum demand record were carried out. With accurate information, design can be cost effective and with high reliability. The scope of work comprises the electrical design and project administration for the Electric Bus charger provisions in 3 depots of Citybus and New World First Bus.
 Warehouse Development at Chai Wan Kok Street, Tsuen Wan, H.K.
The development is with 25 storeys warehouse and acts as a logistic centre for customers. Total floor area is around 82,000m2.

 Logistic Centre for Broadway in Tsuen Wan, H.K.
The logistic centre occupies 8 storeys with total floor area of 23,000m2. The time for design, tender and construction is only 8 months.


 Godown at TMTL 397, Tuen Mun, H.K.
Consultancy services comprises the M & E design and project administration for the Godown with total floor area of around 18,000m2.


 Wizen Garment Factory at Zhong Shan, PRC
The manufacturing plant comprises of knitting, sewing and packaging facilities with boiler, compressed air, and other M&E systems. Total floor area is around 45,000m2 occupying a site of 60,000m2.

 Laundry Plant at On Lok Tsuen, Fanling, N.T., H.K.
The plant embraces steam boilers, central washing, cleaning, ironing and vacuum distribution system occupying around 7,100m2. The scope of services for the laundry plant includes the design and project administration of the steam system, compressed air system, ACMV system, electrical distribution system, auxiliary services system, plumbing & drainage system, fire services systems and vertical transportation system.

 IDT Manufacturing Facilities at Shenzhen, Guangdong, PRC
The manufacturing facilities include injection moulding plant, SMT & bonding plant, class 100,000 clean rooms, PCBA plants etc. Total floor area of the manufacturing facilities is around 47,000m2. The scope of service for the manufacturing facilities includes the design and project administration of the 8,000kVA electrical generating plant, ACMV system, fire services systems and electrical distribution systems.
 Industrial Building at 111-113 How Ming Street, Kwun Tong, Kln., H.K.
The building is a 21-storey building with total floor area of 19,500m2. The scope of consultancy service for the development includes the design and project administration of all M & E systems.

 Industrial Building at 26 Hung To Road, Kwun Tong, Kln., H.K.
The building is a 24-storey building with total floor area of 20,500m2. The scope of consultancy service for the development includes the design and project administration of all M & E systems.
 
 

2006-2020 Copyright © Talent Mechanical & Electrical Engineers Ltd. All Rights Reserved.