New Building
 
Renovation & Retrofit
 
High Fashion
 
Shopping Mall / Department Store
 
Superstore
 Residential Development at 3-6 Glenealy, Central, H.K.
The development consists of one block of 27-storey residential tower together with shops, clubhouse and carpark with total floor area of around 8,000m2. Open kitchen design is adopted for studio flats in considerations of modern look and flexible area usage. The scope of consultancy includes M&E design and project administration.
 Refurbishment at 666 Nathan Road, Mongkok, Hong Kong
Total refurbishment area for the existing commercial building is around 7,250 m2. Talent carries out M&E design and project administration for the reprovision of M&E services and upgrading of main M&E plants such as new chiller system, transformer room and power distribution system.
 Commercial Re-Development at 27-31 Sugar Street, Causeway Bay, H.K.
The redevelopment combines two separate lots and buildings into a new single Ginza-style commercial building for restaurant and retail usage. There are also landscape garden on middle floors and roof floor. The total gross floor area is about 5,800m2. Talent carries out M&E design and project administration.

 Façade Enhancement Works at The Bank of China Building, Central, H.K.
We are engaged in the Mechanical & Electrical consultancy services for façade enhancement works of this Grade 1 historic and well-known local landmark building in Central. Works include enhancement of the existing façade and roof by providing lighting effect and lightboxes installation, associated power supply and chiller plant modification. Works are carried out in 2 phases. The whole installation is expected to be completed by September 2017. Close co-ordination and swift decision are critical to the timely completion of the tightly scheduled project.
 Retail Network Project for Zung Fu at Chai Wan and Hung Hom, H.K.
We are engaged in the renovation works for Zung Fu (Mercedes Sales and Service Centres) in Chai Wan and Hunghom with total area of about 17,000m2 and 6,000m2 respectively. Buildings are equipped as new/renovated car sales and service centres. New car ramp will be constructed to facilitate the traffic for Chai Wan Project. Talent carries out the M&E design and project administration for the projects, particularly to upgrade the existing M&E systems including new/upgraded transformers, normal and essential power supply systems, chiller plant system, fire services, plumbing & drainage systems and lift installations to achieve high energy efficiencies and fulfill the functional requirements of the projects.

 Renovation of Metro City Plaza Phase II Fresh Market, Tseung Kwan O, H.K.
The renovation works for existing fresh market involve re-layout of stalls and circulation, re-provision of existing mechanical & electrical services and enhancement of existing façade with total renovation area of approximately 2,700m2. During the renovation period, the portion of the fresh market is still being operated. Meticulous phasing, services changeover, noise control and prevention of nuisance are vital to fresh market operation.

 California Fitness Centres at Whampoa Garden, Hunghom, H.K.
At the completions of 2 California Fitness Centres in Yan Ching Street, Tuen Mun and renovation of Myoga in Grand Tower, Mongkok H.K. in mid of 2015, we started the design work for the centre in Whampoa Garden. The centre occupies G/F of site 4 in Whampoa Garden with total floor area of 2,500m2. Talent carries out M&E design and project administration for the project. The project is due to completion by 1st quarter of 2016.

 Renovation of Shopping Arcades in Tsimshatsui Centre & Empire Centre, TST, HK
Talent has been taking part in the system condition studies and renovations of these 2 buildings for many years. This is the 3rd time Talent carries out M&E consultancy for the renovation works. The work covers G/F and Upper Ground of the 2 buildings. Working with the long term client is always pleasant and fortifying our confidence.

 Li & Fung Office at Four Point Sheraton, Shenzhen, Guangdong, China
The new office locates at 1/F to 3/F podium of the hotel. It consists of offices, meeting rooms, multi-purpose rooms, recruitment center, canteens, laboratories, work rooms, etc. with total floor area around 12,000m2. Talent carried out design and project administration for the fitting out works.
 Cinemas at Tseung Kwan O Area 56, H.K
The cinema cluster consists of 7 cinemas with total area of 2,100m2. Talent carries out M&E design and project administration for the project.

 A&A Works for Prosperity Centre, Kwai Chung, H.K.
The commercial office blocks are converted from an industrial building with floor area of 21,185m2. Electrical and cooling load calculations, plant condition and configuration studies are carried out to cope with operation needs of new usages. Works include replacement of existing chiller plant and MVAC system, addition of generator set, replacement / addition of lifts and escalators and the associated modification works of other M&E services.

 A&A Works for Yoo Hoo Tower, Kwai Chung, H.K.
The commercial office blocks are converted from an industrial building with floor area of 12,293m2. The scope of works comprise of electrical and cooling load calculations, plant condition and configuration studies to cope with operation needs of new usages. Works include replacement of existing chiller plant and MVAC system, relocation & upgrading of the existing transformer, main switch rooms replacement, addition of lifts and associated modification works of other M&E services.
 Retail Banking Outlets of the Bank of China (HK)
Talent carried out M&E designs and project administrations for a number of retail banking outlets of the Bank of China (HK) :-
  • Tsimshatsui
  • - 1 branch with 300m2 (completed 2014)
  • Tsimshatsui East
  • - 1 branch with 500m2 (completed 2014)
  • Causeway Bay
  • - 3 branches with 350m2 (completed 2015)
  • North Point
  • - 2 branches with 700m2 (completed 2015)
  • Yuen Long
  • - 2 branches with 1,100m2 (completed 2015)
     Proposed Renovation at 5/F Windsor House, 311 Gloucester Rd., Causeway Bay, H.K.
    The commercial complex is located at the heart of Causeway Bay district. The M&E consultancy is for the remodeling of shopping area on 5/F and the refurbishment of facade. During the renovation period, the commercial complex is still being operated. Meticulous phasing, noise control and prevention of nuisance are vital to shopping centre / office operation.

     A&A Works for G/F to 2/F and 11/F & 12/F, ICBC Tower, 122 Queen's Road Central, H.K.
    The project entials the upgrading of internal shopping area on G/F to 2/F of a commercial centre and the renewal of building facade with total floor area of 279m2. The scope includes the demolition of slabs for 12/F and R/F for transferring GFA to podium. Talent carries out M&E design and project administration for the project.
     LED Wall and AV System at 1/F Star House, H.K.
    A new LED wall of 27m x 2m and audio visual system are provided at Star House. Talent carries out M&E design and project administration for the project.

     California Fitness Centre at Yan Ching Street, Tuen Mun, H.K.
    The fitness centre occupies 1/F to 3/F at 7-35 Yan Ching Street, Tuen Mun with totel floor area of 2,280m2. Talent carries out M&E design and project administration for the project.
     Renovation of Wai Wah Commercial Centre at Wilmer Street, Sheung Wan, H.K.
    The building consists of 27-storey office building and shops at G/F. The renovation comprises to convert the usage of G/F to 2/F to F&B, upgrading internal office and renewal of building façade with total floor area of 7,430m2. Talent carries out M&E design and project administration for the project.

     Renovation of Mckinsey & Company Office at Kerry Center, Beijing, China
    The office occupies 19/F & 20/F of the Beijing Kerry Center with floor area of 1,800m2. Mission critical facilities are air purification system and intelligent control system. Talent carries out E&M design for the office and infrastructure upgrading.
     California Fitness Centre at Kin Lee Building, Wanchai, H.K.
    The fitness centre occupies 1/F & 2/F of the building with total floor area of 1,740m2. Talent carries out M&E design and project administration for the project.
     California Fitness Centre at Season Mall, Tianhe, Guangzhou, China
    The fitness centre occupies 3/F & 4/F of the season mall with total floor area of 1,750m2. Talent carries out M&E design and project administration for the project. This is the 11th fitness centre Talent commissioned for the client.
     China Visa Office in China Resources Building, Wanchai, H.K.
    The visa office is located in the high block of the China Resources Building and is operated by China Foreign Affair Office with total area 4,000m2 occupying 3-storey premises. The premises comprises of visa hall, back office and canteen. Talent carried out M&E design and project administration.
     California Fitness Centre at L Place, Tsimshatsui, Hong Kong
    The fitness centre occupies 11/F to 16/F of The L Place in Central with floor area of 2,300m2. This is the 8th fitness center Talent commissioned for the same client. Fully grasping the client’s requirements renders us carrying out design work expediently. We have also commissioned another California Fitness Centre in Grand Plaza in Mongkok and is targeted to complete this year.

     Cinemas in Shanghai, Chengdu, Chongqing and Shenyang, China

    A popular cinema chain expands its territory in China. We are engaged in 4 of their target locations. Each of the cinema clusters is with 6 to 8 cinemas. Talent carries out M&E design and project administration for these cinema clusters.

     California Fitness Centre at The One, Nathan Road, Tsim Sha Tsui, H.K.

    The fitness centre occupies UG2/F, 9/F to 11/F of The One with total floor area of 2,300m2. This is the 7th fitness center Talent commissioned for the same client.
     Converision of Office to Food Outlets on 2/F & 3/F Causeway Centre, Wanchai, H.K.
    2/F & 3/F Causeway Centre was office space with total area of 4,000m2 and become food outlets after conversion. It forms a food outlet cluster with Salitun at the level below.

     Refurbishment of China Resources Headquarters on 49/F & 50/F China Resources Building, Wanchai, H.K.

    The headquarters were refurbished in 1997 and undergoes another renovation and refurbishment in 2010. Total area is around 3,000m2 with outdoor landscape space of around 1,200m2.All major M&E equipment and facilities are replaced.

     Fit-out for T. Rowe Price Office at 21/F Jardine House, H.K.

    The consultancy for the financial institution comprises of M&E services for the fitting-out of office area and server room with total area of around 1,640m2.

     Conversion of Shangri-La Hotel in Qingdao, Shandong, China

    Part of Shangri-La Hotel in Qingdao underwent modification converting 17,000m2 service apartments into offices. The whole design and construction period is only 6 months. This needs a tight co-ordination and collaboration among the design team, client and the contractor.

     Remodelling of China Resources Building Cluster, Wanchai, H.K.
    The project covers the remodelling of podium shops in Causeway Centre, China Resources Building, redevelopment of low block for erection of a hotel, reshuffle the top 3 storeys of the China Resources Building, remodelling of the Chinese garden at Harbour Road, refurbishment of facade of China Resources Building and Causeway Centre.

     Myoga in World Trade Centre, Causeway Bay, H.K.
    The centre is for high cabinet yoga which is the 2nd project of the same type we commissioned for JV Fitness Group. Total floor area is around 1,620m2.

     California Fitness Centre in Mega Box, Kowloon Bay, H.K.
    The fitness centre occupies 7/F & 8/F of the Mega Box with total floor area of 2,850m2. An outdoor swimming pool of 3,580m2 is also part of the centre.

     California Fitness Centre at Shanghai, China
    The fitness centre is located in Luwan district in Shanghai with an area of 3,500m2. This is one of the pilot centre in China.
     Izi Business Centre at 151 Hollywood Road, Central, H.K.
    The business centre is 24 hour operated with floor area of about 3,000m2 and 48 business modules.
     IBM Office at Warwick House, Taikoo Place, H.K.
    Scope includes design and project administration of the M&E installation for the fitting-out project. The office occupies an floor area of 1,600m2 including offices and server rooms.


     Remodelling of Stanley Plaza & Tsz Wan Shan Shopping Centre, H.K.
    The 2 shopping arcades are owned and managed by The Link. These shopping arcades are undergoing upgrading and renewal to match market needs. Talent was engaged by the Architect to carry out M&E consultancy.


     Renovation of Canteen at 2/F Causeway Centre, Wanchai, H.K.
    The canteen is used by CRC Group and is undergoing complete renovation. The scope of work include the design and project administration for all M&E system.

     California Fitness Centre at 638 Nathan Road and Sai Yeung Choi
       Street, Kln. H.K.

    The fitness club in Nathan Road is for the teaching of high ambient Yoga with total floor area of 2,600m2. Heating facility is provided to achieve high room temperature. The one in Sai Yeung Choi Street is a regular fitness centre with floor area of 2,600m2.
     Bank of China Kwun Tong (Hoi Yuen Road), Shatin & TST (Carnavon Road) Branches
    The scope of work comprises the M&E design and project administration for the 3 BOC branches.

     Whirlpool Technology Centre, Shenzhen, China
    The technology centre comprises research, design, product testing facilities and offices which occupies 5,000m2 of floor area. M&E services include MVAC, electrical, fire services, power conversion system, compressed air system, LPG and natural gas supply system.

     F.O. of China Resources Shenzhen Headquarter, Shenzhen, China
    The consultancy comprises of regular M&E services, server room A/C, UPS, video conferencing and 24 hour A/C. The office is the headquarter of CRC for Shenzhen operation.


     California Fitness Centre in Prestige Tower, TsimShaTsui, H.K.
    The scope of service comprises of the M&E design and project administration for the fitness club with total floor area of 3,400m2.

     Refurbishment of HSBC Banquet Floor at L40, HSBC Headquarter, Central, H.K.
    The scope of service comprises of the M & E design and project administration for the HSBC banquet floor at Level 40 (650m2) of the HSBC Headquarter Building, H.K.

     Renovation of Shopping Arcades at Tsim Sha Tsui Centre & Empire Centre, H.K.
    The renovation comprises the upgrading and refurbishment of the shopping arcades of the two buildings with floor area of around 35,000m2.

     F.O. of Kodak Marketing Office at Cityplaza 3, Quarry Bay, H.K.
    The F.O. work is for the relocation of Kodak Marketing Office with total area of area 1,300m2.


     F.O. of Offices Deutsche Bank at Cheung Kong Centre, Central, H.K.
    The F.O. work is for the extension of current office with extended area of around 1,800m2.


     Renovation of Olympian City 1 at Yaumatei, H.K.
    The renovation comprises the repositioning of the shops and arcades occupying 3 retail storeys and with area of 7,000m2. The scope of consultancy includes feasibility study, design and project administration of all M & E services.



     Government Office on 5/F ~ 17/F at Skyline Tower, NKIL 5846, Kowloon Bay,
       H.K.

    The Government Offices occupy 11 floors at the Skyline Tower with a total floor area of 27,500m2. The consultancy cover design of all electrical distribution system, lighting and ELV systems for project.

     

     F.O. of Headquarter of China Resources Co. at Beijing, China
    M & E consultancy for the fitting-out of new office comprising M & E services, server room A/C & power, video conferencing and 24 hours A/C.


     Renovation of Podium of Causeway Centre, Wanchai, H.K.
    The podium level of the Causeway Centre was used as exhibition hall and is converted to shops and food outlets. The scope of consultancy includes design and project administration to all M & E services.

     HKSAR Beijing Office, Beijing, China
    The office is located in Hendenson Centre in Beijing and is the main office of the Government of Hong Kong SAR in Beijing. The scope of consultancy is to prepare all M & E design for the fit-out of the office for the Contractor to perform design and build contract.

     Improvement of Civil Works Accommodation of
       MTRC Kowloon Bay Depot
    , H.K.

    The Civil Work Accommodations in Kowloon Bay Depot comprises several scattered premises and a newly built low rise building. The scope of consultancy comprises the survey of the existing services, design and project administration for all M & E systems.

     Refurbishment of German Consulate’s Office, 21/F United Centre,
       Admiralty, H.K.

    The German Consulate’s Office in Hong Kong occupies an area of around 900m2 and is completely refurbished. The scope of commission comprises the design and project administration of all M & E systems.

     Refurbishment of Headquarter of Beijing (Holding) Co. Ltd. at 34/F
      Shun Tak Centre, Sheung Wan, H.K.

    The office is the headquarter of a listed company Beijing (Holding) Co. Ltd. Total area is around 1,800m2. The scope of commission comprises the survey of the existing services, design and project administration of all M & E systems.
     Fitting-out for CKK Building at On Lok Tsuen, Fanling, N.T., H.K.
    The scope of consultancy comprises the Central MVAC system for the 2 office floors with a total floor area of around 2,800m2 and the modification of the electrical system for separate metering on each storey.

     Refurbishment of Headquarter of China Resources Co. Ltd. at 49/F &
       50/F China Resources Building, H.K.

    The office floor and the banquet floor on 49/F & 50/F of China Resources Building is the headquarter of the China Resources Group. Total floor area is around 2,800m2. The refurbishment include the complete replacement of all M & E services and the application of Fan Power VAV system which turns to be a successful one and cures the former problems encountered.
     Addition of Chillers for Scenic Garden, Lam Tin, H.K.
    Design for addition of chillers and upgrading of the power supply system.
     Wah Sum Shopping Centre at Fanling, N.T., H.K.
    The shopping centre is the commercial podium of a residential complex occupying 2 storeys. Total area is around 4,800m2. The scope of commission comprises the design of all M & E systems.
     Replanning of G/F Shops at 235-249 Yee Kuk Street, Sham Shui Po, Kln., H.K.
    The G/F shops was sold to new owner and replanned into a shopping arcade. The scope of services includes the design of all M & E systems.
     Replanning of G/F Shops in New Mandarin Plaza at TST, H.K.
    The shopping mall was replanned after it was sold to a new owner. Total floor area is around 2,300m2. The scope of consultancy service includes the survey of the existing services, M & E design and project administration for the replanning of shopping arcades and retail space.
     Renovation for Shopping Centre and Plant Conditions Audit for Tsim  
       Sha Tsui Centre
    , TST, H.K.

    The building is a mixed use premises with shopping arcades at podium levels and offices on upper floors with total floor area of around 82,000m2. The scope of commission of all the M & E services includes the replanning of shopping arcades and retail spaces for 6 storeys of retail floors with total floor area of around 24,000m2. The other part of consultancy work is the condition audit of M & E systems and plants.

     La Cite Italian Restaurant at Pacific Place I, Admiralty, H.K.
    The restaurant is located in a prime area in H.K. with total floor area of around 600m2. The scope of work comprises the M & E fitting-out design. Interior design was prepared in New York.
     New Trend Plaza at 278-288 King’s Road, North Point, H.K.
    The shopping arcade was converted from a two storeys department store occupying a total area of 6,800m2. The scope of consultancy comprises the design and the project administration of all M & E systems.
    New Building  |  Renovation and Retrofit  |  High Fashion  |  Shopping Mall / Department Store  |  Superstore
     

    2006-2020 Copyright © Talent Mechanical & Electrical Engineers Ltd. All Rights Reserved.

    info@talentme.com  | (852) 2838 9133  | (852) 2836 0750